天天干天天曰-天天干天天夜-天天干天天谢-天天干天天玩天天操-久99久精品免费视频热77-久99久爱精品免费观看视频

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1563

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://m.wildrosebb.com//


久久亚洲AV麻豆永久无码精品 | 久久天天躁狠狠躁夜夜躁2014 | 精品动漫中文子幕亚洲欧美 | 好爽好大久久久级婬片毛片 | 高清无码中文字幕在线观看 | 国产精品视频一区二区三区, | 91人妻人人澡人人爽人人精品 | 91人人妻人人爽人人狠狠 | 久艹视频在线观看这里只有精品 | 国产无遮挡又黄又爽免费网站 | 日本中文一区二区三区亚洲 | 人妻洗澡被强公日日澡 | 重口sm一区二区三区视频 | 中文字幕一区二区人妻本田岬 | 国产极品精品无码在线播出 | 国产熟女高潮一区二区三区 | 精品动漫区一区二在线观看 | 一区二区三区 国产传媒观看 | 精品乱码一区内射人妻无码 | 国产在线精品一区二区在线看 | 国产一在线精品一区在线观看 | 日韩内射美女片在线观看网站 | 欧洲三级国产三级日本三级 | 日产无码1区2区在线观看 | 亚洲大色堂人在线无码 | 日本VA欧美VA精品发布 | 亚洲精品乱码久久久久久蜜桃 | 女自慰喷水免费观看www | 激情偷乱人伦小说视频在线 | 国产精品原巨作AV无遮挡 | 亚洲一区二区三区视频蜜柚 | 国产成a人亚洲精品无码樱花 | 亚洲精品456在线播放 | 图片区小说区图片区偷拍蜜 | 18禁拍拍拍网站免费 | 99精品国产自在现线观看 | 亚洲成a人片在线观看无码 免费欧美在线观看自拍 | 国产成人无码视频在线观看 | 男人的天堂无码Av色偷偷 | 国产又色又爽又刺激在线播放 | 中文字幕av免费专区 |